Horizon for Renewable Energy Solutions lead engineer has been the engineer in charge for designing and installation of the largest vertical closed loop geothermal system in the MENA region up to date.
Project has been operational since January 2011 with trouble-Free excellent performance exceeding design preliminary expectations.
Cooling Load: 1.6 MW
Heating Load: 1.4 MW
Borehole Depth: 100m
Number of Boreholes: 425
Cooling COP: 4.3
Heating COP: 4.1